TAP143426 is an electric transmission substation in Mississippi, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorALABAMA POWER CO
Coordinates31.4964, -88.2366

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#42247115 kVALABAMA POWER COIN SERVICE17.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143426, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143426 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109065Substation-AdjacentALWashington County230 kV300 MW3.7 yrs68.3
UNKNOWN109320Substation-AdjacentALWashington County230 kV300 MW3.7 yrs68.0
UNKNOWN109319Substation-AdjacentALWashington County230 kV300 MW3.7 yrs67.6
CHARLES R LOWMANSubstation-AdjacentALClarke County230 kV300 MW1.4 yrs67.2
WEST MCINTOSH (POWERSOUTH)Substation-AdjacentALWashington County230 kV300 MW1.4 yrs66.9
CHATOMSubstation-AdjacentALWashington County230 kV300 MW1.4 yrs65.4
UNKNOWN109767Substation-AdjacentMSGreene County115 kV100 MW1.4 yrs64.2
MCINTOSH (AL)Substation-AdjacentALWashington County115 kV100 MW3.7 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143426 substation, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.