TAP143376

Substation

Mississippi · ALABAMA POWER CO

Max voltage
115
kV

TAP143376 is an electric transmission substation in Mississippi, operated by ALABAMA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
Coordinates30.9781, -88.3229

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7102115 kVALABAMA POWER COIN SERVICE18.8 mi
#20625115 kVALABAMA POWER COIN SERVICE0.0 mi
#41187115 kVIN SERVICE17.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143376, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143376 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109076Substation-AdjacentALMobile County230 kV300 MW1.4 yrs70.5
UNKNOWN109130Substation-AdjacentALMobile County230 kV300 MW3.7 yrs69.1
BENNDALE 230Substation-AdjacentMSGeorge County230 kV300 MW1.4 yrs69.0
UNKNOWN109085Substation-AdjacentALMobile County230 kV300 MW1.4 yrs68.8
UNKNOWN109065Substation-AdjacentALWashington County230 kV300 MW3.7 yrs68.3
UNKNOWN109320Substation-AdjacentALWashington County230 kV300 MW3.7 yrs68.0
UNKNOWN109319Substation-AdjacentALWashington County230 kV300 MW3.7 yrs67.6
BIG CREEKSubstation-AdjacentALMobile County500 kV1,000 MW1.4 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143376 substation, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.