TAP141949

Substation

Mississippi · ALABAMA POWER CO

Max voltage
161
kV

TAP141949 is an electric transmission substation in Mississippi, operated by ALABAMA POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorALABAMA POWER CO
Coordinates33.6514, -88.2768

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2801161 kVALABAMA POWER COIN SERVICE8.5 mi
#36947161 kVALABAMA POWER COIN SERVICE0.1 mi
#46389161 kVALABAMA POWER COIN SERVICE3.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP141949, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP141949 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CALEDONIASubstation-AdjacentALLamar County500 kV1,000 MW1.4 yrs77.0
WESTPOINTSubstation-AdjacentMSClay County500 kV1,000 MW1.4 yrs76.0
LOWNDESSubstation-AdjacentMSLowndes County500 kV1,000 MW1.4 yrs73.5
Greenfield (WESTPOINT - BROWNS FERRY)GreenfieldMSClay County500 kV1,000 MW1.4 yrs72.2
Greenfield (WESTPOINT - LOWNDES)GreenfieldMSClay County500 kV1,000 MW1.4 yrs71.7
UNKNOWN109565Substation-AdjacentMSLowndes County161 kV100 MW1.4 yrs71.1
UNKNOWN109567Substation-AdjacentMSLowndes County161 kV100 MW1.4 yrs70.0
UNKNOWN109566Substation-AdjacentMSLowndes County161 kV100 MW1.4 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.