HOUSTON

Substation

Mississippi · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

HOUSTON is an electric transmission substation in Mississippi, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates33.9136, -89.0873

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#56662161 kVIN SERVICE11.8 mi
#56672161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE16.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HOUSTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HOUSTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN109619 - WESTPOINT)GreenfieldMSClay County500 kV1,000 MW1.4 yrs72.9
Greenfield (UNKNOWN109619 - WESTPOINT)GreenfieldMSClay County500 kV1,000 MW1.4 yrs70.5
UNKNOWN109629Substation-AdjacentMSClay County161 kV100 MW1.4 yrs69.7
UNKNOWN109627Substation-AdjacentMSWebster County161 kV100 MW1.4 yrs69.2
UNKNOWN109829Substation-AdjacentMSLee County161 kV100 MW1.4 yrs68.3
TAP144802Substation-AdjacentMSLee County161 kV100 MW1.4 yrs68.0
BISSELLSubstation-AdjacentMSLee County161 kV100 MW1.4 yrs68.0
UNKNOWN109827Substation-AdjacentMSLee County161 kV100 MW1.4 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.