BROWNS FERRY is an electric transmission substation in Mississippi. It is classified as extra-high-voltage (500 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates34.1704, -87.8853

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#24316500 kVIN SERVICE118.2 mi
#31604500 kVIN SERVICE111.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BROWNS FERRY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BROWNS FERRY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROWNS FERRYSubstation-AdjacentALMarion County500 kV1,000 MW1.4 yrs73.6
Greenfield (WESTPOINT - BROWNS FERRY)GreenfieldALFranklin County500 kV1,000 MW1.4 yrs69.7
Greenfield (WESTPOINT - BROWNS FERRY)GreenfieldALMarion County500 kV1,000 MW1.4 yrs68.8
Greenfield (WESTPOINT - BROWNS FERRY)GreenfieldALMarion County500 kV1,000 MW1.4 yrs68.6
Greenfield (UNION - BROWNS FERRY)GreenfieldMSTishomingo County500 kV1,000 MW1.4 yrs68.2
Greenfield (UNION - BROWNS FERRY)GreenfieldALColbert County500 kV1,000 MW1.4 yrs68.1
Greenfield (WESTPOINT - BROWNS FERRY)GreenfieldALFranklin County500 kV1,000 MW1.4 yrs67.9
Greenfield (UNION - BROWNS FERRY)GreenfieldMSTishomingo County500 kV1,000 MW1.4 yrs67.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BROWNS FERRY substation, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.