BENTON

Substation

Mississippi · TENNESSEE VALLEY AUTHORITY

Max voltage
500
kV

BENTON is an electric transmission substation in Mississippi, operated by TENNESSEE VALLEY AUTHORITY. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates34.8290, -89.2004

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1361500 kVTENNESSEE VALLEY AUTHORITY0.5 mi
#37251500 kVTENNESSEE VALLEY AUTHORITYIN SERVICE27.3 mi
#64602500 kVIN SERVICE0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BENTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BENTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PLEASANT HILLSubstation-AdjacentMSUnion County500 kV1,000 MW1.4 yrs76.6
BENTONSubstation-AdjacentMSBenton County500 kV1,000 MW1.4 yrs74.8
TAP154305Substation-AdjacentTNFayette County161 kV100 MW3.7 yrs73.5
CANADAVILLESubstation-AdjacentTNFayette County161 kV100 MW3.7 yrs72.0
MOSCOWSubstation-AdjacentTNFayette County161 kV100 MW3.7 yrs71.4
TAP154302Substation-AdjacentTNFayette County161 kV100 MW3.7 yrs70.2
OAKLANDSubstation-AdjacentTNFayette County161 kV100 MW3.7 yrs70.2
Greenfield (CORDOVA - BENTON)GreenfieldTNFayette County500 kV1,000 MW1.4 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen