TAP139320

Substation

Maryland · THE POTOMAC EDISON CO

Max voltage
230
kV

TAP139320 is an electric transmission substation in Maryland, operated by THE POTOMAC EDISON CO. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorTHE POTOMAC EDISON CO
Co-ownerTHE POTOMAC EDISON COMPANY
Coordinates39.5212, -77.1896

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#26872230 kVTHE POTOMAC EDISON COMPANYIN SERVICE0.0 mi
#47089230 kVTHE POTOMAC EDISON COIN SERVICE6.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139320, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139320 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP139321Substation-AdjacentMDMontgomery County500 kV1,000 MW3.1 yrs75.6
CLARKSBURGSubstation-AdjacentMDMontgomery County230 kV300 MW3.1 yrs74.8
HIGH RIDGESubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs74.7
BRIGHTONSubstation-AdjacentMDHoward County500 kV1,000 MW3.1 yrs74.6
DOUBSSubstation-AdjacentMDFrederick County500 kV1,000 MW3.1 yrs74.2
TAP139087Substation-AdjacentMDHoward County230 kV300 MW3.1 yrs74.2
UNKNOWN133865Substation-AdjacentVALoudoun County230 kV300 MW3.1 yrs74.1
WILDE LAKESubstation-AdjacentMDHoward County230 kV300 MW3.1 yrs73.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139320 substation, Maryland. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.