TAP139239

Substation

Maryland · THE POTOMAC EDISON COMPANY

Max voltage
230
kV

TAP139239 is an electric transmission substation in Maryland, operated by THE POTOMAC EDISON COMPANY. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorTHE POTOMAC EDISON COMPANY
Coordinates39.4899, -77.5821

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#35242230 kVTHE POTOMAC EDISON COMPANYIN SERVICE13.3 mi
#47139230 kVTHE POTOMAC EDISON COMPANYIN SERVICE3.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139239, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139239 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLARKSBURGSubstation-AdjacentMDMontgomery County230 kV300 MW3.1 yrs74.8
UNKNOWN116991Substation-AdjacentVALoudoun County230 kV300 MW3.1 yrs74.3
DOUBSSubstation-AdjacentMDFrederick County500 kV1,000 MW3.1 yrs74.2
TAP139243Substation-AdjacentVALoudoun County230 kV300 MW3.1 yrs74.2
UNKNOWN133865Substation-AdjacentVALoudoun County230 kV300 MW3.1 yrs74.1
UNKNOWN122905Substation-AdjacentMDMontgomery County230 kV300 MW3.1 yrs73.6
UNKNOWN122882Substation-AdjacentMDWashington County230 kV300 MW3.5 yrs71.1
QUINCE ORCHARDSubstation-AdjacentMDMontgomery County230 kV300 MW3.1 yrs71.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139239 substation, Maryland. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.