TAP136777

Substation

Maine · EMERA MAINE

Max voltage
115
kV

TAP136777 is an electric transmission substation in Maine, operated by EMERA MAINE. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorEMERA MAINE
StateMaine
Coordinates44.6905, -68.7607

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28941115 kVEMERA MAINEIN SERVICE6.8 mi
#30652115 kVEMERA MAINEIN SERVICE5.2 mi
#39312115 kVEMERA MAINEIN SERVICE20.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP136777, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP136777 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GRAHAMSubstation-AdjacentMEHancock County115 kV100 MW3.5 yrs68.3
GRAHAM 46KVSubstation-AdjacentMEHancock County115 kV100 MW3.5 yrs67.4
PENOBSCOT ENERGY RECOVERYSubstation-AdjacentMEWaldo County115 kV100 MW3.5 yrs65.9
ORRINGTONSubstation-AdjacentMEWaldo County345 kV600 MW3.5 yrs65.6
Greenfield (ORRINGTON - COOPERS MILLS)GreenfieldMEWaldo County345 kV600 MW3.5 yrs64.8
UNKNOWN162183Substation-AdjacentMEHancock County115 kV100 MW3.5 yrs64.2
Greenfield (ORRINGTON - COOPERS MILLS)GreenfieldMEWaldo County345 kV600 MW3.5 yrs64.0
Greenfield (ORRINGTON - ALBION ROAD)GreenfieldMEWaldo County345 kV600 MW3.5 yrs63.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen