HIGHLAND
SubstationMaine · CENTRAL MAINE POWER CO
HIGHLAND is an electric transmission substation in Maine, operated by CENTRAL MAINE POWER CO. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #6889 | 115 kV | CENTRAL MAINE POWER CO | IN SERVICE | 4.8 mi |
| #25521 | 115 kV | CENTRAL MAINE POWER CO | IN SERVICE | 22.9 mi |
| #26434 | 115 kV | CENTRAL MAINE POWER CO | IN SERVICE | 3.8 mi |
| #47605 | 115 kV | CENTRAL MAINE POWER CO | IN SERVICE | 19.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of HIGHLAND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ALBION ROAD | Substation-Adjacent | ME | Waldo County | 345 kV | 600 MW | 3.5 yrs | 69.1 |
| Greenfield (ORRINGTON - COOPERS MILLS) | Greenfield | ME | Waldo County | 345 kV | 600 MW | 3.5 yrs | 64.0 |
| COOPERS MILLS | Substation-Adjacent | ME | Kennebec County | 345 kV | 600 MW | 3.5 yrs | 63.6 |
| TAP136786 | Substation-Adjacent | ME | Waldo County | 115 kV | 100 MW | 3.5 yrs | 63.5 |
| LINCOLNVILLE | Substation-Adjacent | ME | Waldo County | 115 kV | 100 MW | 3.5 yrs | 62.7 |
| MEADOW ROAD | Substation-Adjacent | ME | Knox County | 115 kV | 100 MW | 3.5 yrs | 62.5 |
| Greenfield (ORRINGTON - COOPERS MILLS) | Greenfield | ME | Waldo County | 345 kV | 600 MW | 3.5 yrs | 61.1 |
| Greenfield (COOPERS MILLS - MAINE YANKEE) | Greenfield | ME | Kennebec County | 345 kV | 600 MW | 3.5 yrs | 60.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for HIGHLAND substation, Maine. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.