TAP143389

Substation

Louisiana · MISSISSIPPI POWER CO

Max voltage
115
kV

TAP143389 is an electric transmission substation in Louisiana, operated by MISSISSIPPI POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMISSISSIPPI POWER CO
Coordinates30.2648, -89.5589

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2234115 kVMISSISSIPPI POWER COIN SERVICE0.0 mi
#36378115 kVMISSISSIPPI POWER COIN SERVICE6.3 mi
#43402115 kVMISSISSIPPI POWER COIN SERVICE2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143389, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143389 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN112544Substation-AdjacentLASt. Tammany Parish230 kV300 MW1.4 yrs72.8
UNKNOWN110434Substation-AdjacentMSHancock County230 kV300 MW1.4 yrs72.5
UNKNOWN110001Substation-AdjacentMSHancock County230 kV300 MW1.4 yrs71.8
UNKNOWN112547Substation-AdjacentLASt. Tammany Parish230 kV300 MW1.4 yrs70.6
UNKNOWN110000Substation-AdjacentMSHancock County230 kV300 MW1.4 yrs70.0
UNKNOWN110004Substation-AdjacentMSHancock County230 kV300 MW1.4 yrs69.8
Greenfield (MC KNIGHT - DANIEL STATION)GreenfieldMSPearl River County500 kV1,000 MW1.4 yrs68.7
TAP143434Substation-AdjacentMSHancock County230 kV300 MW1.4 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143389 substation, Louisiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.