TAP143381

Substation

Louisiana · ENTERGY LOUISIANA INC

Max voltage
230
kV

TAP143381 is an electric transmission substation in Louisiana, operated by ENTERGY LOUISIANA INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorENTERGY LOUISIANA INC
Coordinates30.0356, -90.4426

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1406230 kVENTERGY LOUISIANA INCIN SERVICE16.3 mi
#26045230 kVENTERGY LOUISIANA INCIN SERVICE2.3 mi
#37554230 kVENTERGY LOUISIANA INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143381, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143381 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN112635Substation-AdjacentLASt. Charles Parish230 kV300 MW1.4 yrs72.8
DERBIGNYSubstation-AdjacentLAOrleans Parish230 kV300 MW1.4 yrs72.6
JOLIETSubstation-AdjacentLAOrleans Parish230 kV300 MW1.4 yrs72.2
TAP143185Substation-AdjacentLAOrleans Parish230 kV300 MW1.4 yrs71.8
MARKET STREET 230 KVSubstation-AdjacentLAOrleans Parish230 kV300 MW1.4 yrs71.8
TAP167047Substation-AdjacentLAOrleans Parish230 kV300 MW1.4 yrs71.1
TAP167048Substation-AdjacentLAOrleans Parish230 kV300 MW1.4 yrs70.7
TAP167041Substation-AdjacentLASt. Charles Parish230 kV300 MW1.4 yrs70.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143381 substation, Louisiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.