TAP142945

Substation

Louisiana · ENTERGY MISSISSIPPI INC

Max voltage
115
kV

TAP142945 is an electric transmission substation in Louisiana, operated by ENTERGY MISSISSIPPI INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorENTERGY MISSISSIPPI INC
Coordinates31.0669, -90.7361

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#29555115 kVENTERGY MISSISSIPPI INCIN SERVICE15.0 mi
#33773115 kVENTERGY MISSISSIPPI INCIN SERVICE24.9 mi
#37964115 kVENTERGY MISSISSIPPI INCIN SERVICE8.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142945, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142945 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DANIEL STATIONSubstation-AdjacentLASt. Helena Parish500 kV1,000 MW1.4 yrs69.9
FRANKLINSubstation-AdjacentMSAmite County500 kV1,000 MW1.4 yrs68.9
UNKNOWN110649Substation-AdjacentMSPike County115 kV100 MW1.4 yrs67.1
Greenfield (MC KNIGHT - FANCY POINT)GreenfieldLAEast Feliciana Parish500 kV1,000 MW1.4 yrs66.9
Greenfield (FRANKLIN - BOGALUSA)GreenfieldMSLincoln County500 kV1,000 MW1.4 yrs66.6
BOGALUSASubstation-AdjacentMSPike County500 kV1,000 MW1.4 yrs66.3
Greenfield (FRANKLIN - BOGALUSA)GreenfieldMSPike County500 kV1,000 MW1.4 yrs66.3
Greenfield (MC KNIGHT - DANIEL STATION)GreenfieldLASt. Helena Parish500 kV1,000 MW1.4 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142945 substation, Louisiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.