TAP142158

Substation

Louisiana · ENTERGY MISSISSIPPI INC

Max voltage
115
kV

TAP142158 is an electric transmission substation in Louisiana, operated by ENTERGY MISSISSIPPI INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorENTERGY MISSISSIPPI INC
Coordinates32.3758, -90.1809

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2550115 kVENTERGY MISSISSIPPI INCIN SERVICE1.9 mi
#18316115 kVENTERGY MISSISSIPPI INCIN SERVICE2.8 mi
#43296115 kVENTERGY MISSISSIPPI INCIN SERVICE3.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142158, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142158 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKEOVERSubstation-AdjacentMSHinds County500 kV1,000 MW1.4 yrs74.7
LAKEOVERSubstation-AdjacentMSHinds County500 kV1,000 MW1.4 yrs74.4
UNKNOWN109667Substation-AdjacentMSMadison County230 kV300 MW1.4 yrs74.1
RAY BRASWELLSubstation-AdjacentMSHinds County500 kV1,000 MW1.4 yrs73.9
UNKNOWN110124Substation-AdjacentMSMadison County230 kV300 MW1.4 yrs72.2
UNKNOWN109659Substation-AdjacentMSRankin County230 kV300 MW1.4 yrs71.2
UNKNOWN109664Substation-AdjacentMSMadison County230 kV300 MW1.4 yrs71.0
YANDELL ROADSubstation-AdjacentMSMadison County230 kV300 MW1.4 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142158 substation, Louisiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.