MINDEN

Substation

Louisiana

Max voltage
115
kV

MINDEN is an electric transmission substation in Louisiana. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

Coordinates32.6113, -93.2895

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3436115 kV0.0 mi
#4601115 kVIN SERVICE3.0 mi
#26036115 kVIN SERVICE3.5 mi
#44618115 kVIN SERVICE0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MINDEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MINDEN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SAREPTASubstation-AdjacentLAWebster Parish345 kV600 MW3.4 yrs72.0
UNKNOWN116792Substation-AdjacentLABossier Parish138 kV100 MW3.4 yrs67.8
UNKNOWN116803Substation-AdjacentLAWebster Parish115 kV100 MW1.4 yrs65.5
MINDENSubstation-AdjacentLAWebster Parish115 kV100 MW1.4 yrs65.0
TAP142002Substation-AdjacentLAWebster Parish115 kV100 MW1.4 yrs64.8
Greenfield (MOUNT OLIVE - UNKNOWN157576)GreenfieldLABienville Parish500 kV1,000 MW1.4 yrs64.4
Greenfield (SAREPTA - LONGWOOD)GreenfieldLABossier Parish345 kV600 MW3.4 yrs64.0
UNKNOWN116903Substation-AdjacentLAWebster Parish115 kV100 MW1.4 yrs63.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.