TAP173225

Substation

Kansas · PIONEER ELECTRIC COOP, INC - (KS)

Max voltage
115
kV

TAP173225 is an electric transmission substation in Kansas, operated by PIONEER ELECTRIC COOP, INC - (KS). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPIONEER ELECTRIC COOP, INC - (KS)
StateKansas
Coordinates37.8099, -100.5065

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#23199115 kVPIONEER ELECTRIC COOP, INC - (KS)IN SERVICE9.9 mi
#57806115 kVPIONEER ELECTRIC COOP, INC - (KS)IN SERVICE0.1 mi
#63838115 kVPIONEER ELECTRIC COOP, INC - (KS)IN SERVICE9.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP173225, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP173225 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN157103Substation-AdjacentKSGray County345 kV600 MW3.5 yrs70.7
HOLCOMBSubstation-AdjacentKSFinney County345 kV600 MW3.5 yrs69.8
CIMARRONSubstation-AdjacentKSGray County345 kV600 MW3.5 yrs69.2
TAP140590Substation-AdjacentKSFinney County115 kV100 MW3.5 yrs65.1
UNKNOWN119623Substation-AdjacentKSGray County115 kV100 MW3.5 yrs64.4
Greenfield (HOLCOMB - CIMARRON)GreenfieldKSFinney County345 kV600 MW3.5 yrs64.4
UNKNOWN119641Substation-AdjacentKSFord County115 kV100 MW3.5 yrs64.4
UNKNOWN119617Substation-AdjacentKSFinney County115 kV100 MW3.5 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP173225 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.