TAP169204

Substation

Kansas · SOUTHERN PIONEER ELECTRIC COMPANY

Max voltage
115
kV

TAP169204 is an electric transmission substation in Kansas, operated by SOUTHERN PIONEER ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSOUTHERN PIONEER ELECTRIC COMPANY
StateKansas
Coordinates37.3640, -98.8048

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#53219115 kVSOUTHERN PIONEER ELECTRIC COMPANYIN SERVICE25.8 mi
#55758115 kVSOUTHERN PIONEER ELECTRIC COMPANYIN SERVICE1.2 mi
#55763115 kVSOUTHERN PIONEER ELECTRIC COMPANYIN SERVICE19.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169204, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169204 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
THISTLESubstation-AdjacentKSBarber County345 kV600 MW3.5 yrs72.5
NINNESCAH WIND ENERGY, LLCSubstation-AdjacentKSPratt County345 kV600 MW3.5 yrs68.2
Greenfield (THISTLE - WOODWARD)GreenfieldKSBarber County345 kV600 MW3.4 yrs65.5
UNKNOWN118231Substation-AdjacentKSPratt County115 kV100 MW3.5 yrs65.0
UNKNOWN119935Substation-AdjacentKSPratt County115 kV100 MW3.5 yrs64.8
UNKNOWN119937Substation-AdjacentKSPratt County115 kV100 MW3.5 yrs64.6
Greenfield (THISTLE - WOODWARD)GreenfieldKSBarber County345 kV600 MW3.4 yrs64.6
Greenfield (THISTLE - WOODWARD)GreenfieldKSBarber County345 kV600 MW3.4 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen