TAP169200

Substation

Kansas · PIONEER ELECTRIC COOP, INC - (KS)

Max voltage
115
kV

TAP169200 is an electric transmission substation in Kansas, operated by PIONEER ELECTRIC COOP, INC - (KS). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPIONEER ELECTRIC COOP, INC - (KS)
StateKansas
Coordinates38.0185, -100.9720

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#55215115 kVPIONEER ELECTRIC COOP, INC - (KS)IN SERVICE3.5 mi
#55754115 kVPIONEER ELECTRIC COOP, INC - (KS)IN SERVICE3.3 mi
#55755115 kVIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169200, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169200 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN209699Substation-AdjacentKSFinney County345 kV600 MW3.4 yrs71.2
HOLCOMBSubstation-AdjacentKSFinney County345 kV600 MW3.5 yrs69.8
SETABSubstation-AdjacentKSScott County345 kV600 MW3.5 yrs68.5
UNKNOWN209699Substation-AdjacentKSHaskell County345 kV600 MW3.5 yrs68.2
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldKSGrant County345 kV600 MW3.4 yrs65.2
TAP140590Substation-AdjacentKSFinney County115 kV100 MW3.5 yrs65.1
Greenfield (UNKNOWN209699 - HITCHLAND)GreenfieldKSGrant County345 kV600 MW3.4 yrs64.4
Greenfield (HOLCOMB - CIMARRON)GreenfieldKSFinney County345 kV600 MW3.5 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP169200 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.