TAP168494 is an electric transmission substation in Kansas. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #54736 | 138 kV | — | IN SERVICE | 9.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP168494, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CHARLES D. LAMB ENERGY CENTER | Substation-Adjacent | OK | Kay County | 345 kV | 600 MW | 3.5 yrs | 68.3 |
| FRONTIER WINDPOWER | Substation-Adjacent | OK | Kay County | 345 kV | 600 MW | 3.5 yrs | 66.6 |
| UNKNOWN118199 | Substation-Adjacent | KS | Cowley County | 138 kV | 100 MW | 3.5 yrs | 65.1 |
| UNKNOWN119810 | Substation-Adjacent | KS | Cowley County | 138 kV | 100 MW | 3.5 yrs | 64.2 |
| TAP168494 | Substation-Adjacent | OK | Kay County | 138 kV | 100 MW | 3.5 yrs | 64.1 |
| Greenfield (ROSE HILL - CHARLES D. LAMB EN) | Greenfield | KS | Sumner County | 345 kV | 600 MW | 3.5 yrs | 63.3 |
| UNKNOWN118198 | Substation-Adjacent | KS | Sumner County | 138 kV | 100 MW | 3.5 yrs | 63.1 |
| UNKNOWN119303 | Substation-Adjacent | OK | Kay County | 138 kV | 100 MW | 3.5 yrs | 62.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP168494 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.