TAP155847 is an electric transmission substation in Kansas, operated by WESTAR ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWESTAR ENERGY INC
StateKansas
Coordinates39.0427, -96.8194

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9218115 kVWESTAR ENERGY INCIN SERVICE1.2 mi
#10065115 kVWESTAR ENERGY INCIN SERVICE3.5 mi
#24642115 kVWESTAR ENERGY INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155847, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155847 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MORRISSubstation-AdjacentKSMorris County345 kV600 MW3.5 yrs70.9
UNKNOWN173218Substation-AdjacentKSDickinson County345 kV600 MW3.5 yrs70.4
EAST MANHATTANSubstation-AdjacentKSPottawatomie County230 kV300 MW3.5 yrs67.9
MCDOWELL CREEKSubstation-AdjacentKSGeary County230 kV300 MW3.5 yrs67.5
Greenfield (SUMMIT - JEFFREY)GreenfieldKSGeary County345 kV600 MW3.5 yrs65.6
UNKNOWN157114Substation-AdjacentKSClay County230 kV300 MW3.5 yrs65.4
UNKNOWN118152Substation-AdjacentKSDickinson County345 kV600 MW3.5 yrs64.8
Greenfield (SUMMIT - JEFFREY)GreenfieldKSDickinson County345 kV600 MW3.5 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155847 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.