TAP149300

Substation

Kansas

Max voltage
138
kV

TAP149300 is an electric transmission substation in Kansas. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateKansas
Coordinates37.0149, -95.6193

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#29683138 kVIN SERVICE0.6 mi
#34063138 kVIN SERVICE7.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149300, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149300 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DELAWARESubstation-AdjacentOKNowata County345 kV600 MW3.4 yrs71.5
UNKNOWN173422Substation-AdjacentKSWilson County345 kV600 MW3.5 yrs67.6
TAP148867Substation-AdjacentOKWashington County138 kV100 MW3.5 yrs65.1
Greenfield (NEOSHO - DELAWARE)GreenfieldKSLabette County345 kV600 MW3.5 yrs64.1
UNKNOWN119356Substation-AdjacentOKWashington County138 kV100 MW3.5 yrs64.0
Greenfield (NEOSHO - DELAWARE)GreenfieldKSLabette County345 kV600 MW3.5 yrs63.9
TAP149683Substation-AdjacentOKWashington County138 kV100 MW3.5 yrs63.8
UNKNOWN118327Substation-AdjacentOKWashington County138 kV100 MW3.5 yrs63.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149300 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.