TAP148900
SubstationKansas
TAP148900 is an electric transmission substation in Kansas. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #20091 | 115 kV | — | IN SERVICE | 3.3 mi |
| #27309 | 115 kV | — | IN SERVICE | 11.7 mi |
| #41327 | 115 kV | — | IN SERVICE | 4.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP148900, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN158180 | Substation-Adjacent | KS | Seward County | 115 kV | 100 MW | 3.5 yrs | 64.6 |
| UNKNOWN119624 | Substation-Adjacent | KS | Haskell County | 138 kV | 100 MW | 3.5 yrs | 63.8 |
| UNKNOWN119632 | Substation-Adjacent | KS | Seward County | 115 kV | 100 MW | 3.5 yrs | 63.6 |
| UNKNOWN119629 | Substation-Adjacent | KS | Seward County | 138 kV | 100 MW | 3.5 yrs | 63.4 |
| UNKNOWN119627 | Substation-Adjacent | KS | Seward County | 138 kV | 100 MW | 3.5 yrs | 63.4 |
| UNKNOWN119630 | Substation-Adjacent | KS | Seward County | 115 kV | 100 MW | 3.5 yrs | 63.4 |
| UNKNOWN118709 | Substation-Adjacent | KS | Seward County | 115 kV | 100 MW | 3.5 yrs | 62.6 |
| UNKNOWN118192 | Substation-Adjacent | KS | Meade County | 115 kV | 100 MW | 3.5 yrs | 62.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP148900 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.