TAP148849
SubstationKansas · SOUTHERN PIONEER ELECTRIC COMPANY
TAP148849 is an electric transmission substation in Kansas, operated by SOUTHERN PIONEER ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #23530 | 115 kV | SOUTHERN PIONEER ELECTRIC COMPANY | IN SERVICE | 0.0 mi |
| #49317 | 115 kV | SOUTHERN PIONEER ELECTRIC COMPANY | IN SERVICE | 0.0 mi |
| #54999 | 115 kV | SOUTHERN PIONEER ELECTRIC COMPANY | IN SERVICE | 7.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP148849, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| IRONWOOD WIND | Substation-Adjacent | KS | Ford County | 345 kV | 600 MW | 3.5 yrs | 69.8 |
| SPEARVILLE | Substation-Adjacent | KS | Hodgeman County | 345 kV | 600 MW | 3.5 yrs | 66.3 |
| UNKNOWN119877 | Substation-Adjacent | KS | Edwards County | 115 kV | 100 MW | 3.5 yrs | 66.2 |
| UNKNOWN118217 | Substation-Adjacent | KS | Kiowa County | 115 kV | 100 MW | 3.5 yrs | 65.6 |
| Greenfield (THISTLE - CLARK COUNTY) | Greenfield | KS | Kiowa County | 345 kV | 600 MW | 3.5 yrs | 65.3 |
| UNKNOWN118056 | Substation-Adjacent | KS | Edwards County | 115 kV | 100 MW | 3.5 yrs | 63.9 |
| Greenfield (THISTLE - CLARK COUNTY) | Greenfield | KS | Kiowa County | 345 kV | 600 MW | 3.5 yrs | 63.7 |
| Greenfield (THISTLE - CLARK COUNTY) | Greenfield | KS | Ford County | 345 kV | 600 MW | 3.5 yrs | 63.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.