TAP140614

Substation

Kansas · MIDWEST ENERGY INC

Max voltage
115
kV

TAP140614 is an electric transmission substation in Kansas, operated by MIDWEST ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMIDWEST ENERGY INC
StateKansas
Coordinates39.7951, -101.8099

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20043115 kVMIDWEST ENERGY INCIN SERVICE1.5 mi
#22584115 kVMIDWEST ENERGY INCIN SERVICE12.6 mi
#33367115 kVMIDWEST ENERGY INCIN SERVICE2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140614, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140614 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN119497Substation-AdjacentKSCheyenne County115 kV100 MW3.5 yrs64.6
UNKNOWN119498Substation-AdjacentKSCheyenne County115 kV100 MW3.5 yrs63.0
TAP140613Substation-AdjacentKSCheyenne County115 kV100 MW3.5 yrs61.2
UNKNOWN119501Substation-AdjacentKSSherman County115 kV100 MW3.5 yrs60.5
UNKNOWN119502Substation-AdjacentKSSherman County115 kV100 MW3.5 yrs59.8
UNKNOWN119496Substation-AdjacentKSSherman County115 kV100 MW3.5 yrs59.6
ST FRANCISSubstation-AdjacentKSCheyenne County115 kV100 MW3.5 yrs59.3
TAP140614Substation-AdjacentKSCheyenne County115 kV100 MW3.5 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen