TAP138877

Substation

Kansas · WESTAR ENERGY INC

Max voltage
115
kV

TAP138877 is an electric transmission substation in Kansas, operated by WESTAR ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWESTAR ENERGY INC
StateKansas
Coordinates38.5552, -96.0956

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#12423115 kVWESTAR ENERGY INCIN SERVICE0.4 mi
#12453115 kVWESTAR ENERGY INCIN SERVICE103.8 mi
#27038115 kVWESTAR ENERGY INCIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138877, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138877 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MORRISSubstation-AdjacentKSMorris County345 kV600 MW3.5 yrs70.9
LANGSubstation-AdjacentKSLyon County345 kV600 MW3.5 yrs69.9
Greenfield (MORRIS - JEFFREY)GreenfieldKSMorris County345 kV600 MW3.5 yrs66.1
Greenfield (LANG - MORRIS)GreenfieldKSMorris County345 kV600 MW3.5 yrs65.7
Greenfield (LANG - SWISSVALE)GreenfieldKSOsage County345 kV600 MW3.5 yrs65.3
TAP138826Substation-AdjacentKSOsage County115 kV100 MW3.5 yrs64.6
Greenfield (LANG - WICHITA)GreenfieldKSChase County345 kV600 MW3.5 yrs64.6
Greenfield (LANG - MORRIS)GreenfieldKSLyon County345 kV600 MW3.5 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen