TAP138807

Substation

Kansas · WESTAR ENERGY INC

Max voltage
115
kV

TAP138807 is an electric transmission substation in Kansas, operated by WESTAR ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWESTAR ENERGY INC
StateKansas
Coordinates38.8790, -94.8068

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3662115 kVWESTAR ENERGY INCIN SERVICE0.4 mi
#4682115 kVIN SERVICE4.5 mi
#21125115 kVWESTAR ENERGY INCIN SERVICE3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138807, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138807 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117601Substation-AdjacentKSJohnson County345 kV600 MW3.5 yrs75.9
UNKNOWN117601Substation-AdjacentMOCass County345 kV600 MW1.4 yrs74.4
WEST GARDNERSubstation-AdjacentKSJohnson County345 kV600 MW3.5 yrs73.6
UNKNOWN118616Substation-AdjacentKSJohnson County345 kV600 MW3.5 yrs73.3
TAP138882Substation-AdjacentMOClay County161 kV100 MW1.4 yrs73.0
HAWTHORNESubstation-AdjacentMOJackson County345 kV600 MW1.4 yrs72.9
STILWELLSubstation-AdjacentKSJohnson County345 kV600 MW3.5 yrs72.6
UNKNOWN117393Substation-AdjacentMOPlatte County161 kV100 MW3.5 yrs72.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.