MORRIS

Substation

Kansas · WESTAR ENERGY INC

Max voltage
345
kV

MORRIS is an electric transmission substation in Kansas, operated by WESTAR ENERGY INC. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines6

Ownership & operation

OperatorWESTAR ENERGY INC
StateKansas
Coordinates38.7190, -96.4597

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#689345 kVWESTAR ENERGY INCIN SERVICE28.9 mi
#37101345 kVWESTAR ENERGY INCIN SERVICE56.9 mi
#41288230 kVWESTAR ENERGY INCIN SERVICE49.7 mi
#42617230 kVWESTAR ENERGY INCIN SERVICE28.6 mi
#45973230 kVWESTAR ENERGY INCIN SERVICE32.7 mi
#13026115 kVWESTAR ENERGY INCIN SERVICE23.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MORRIS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MORRIS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MORRISSubstation-AdjacentKSMorris County345 kV600 MW3.5 yrs70.9
MCDOWELL CREEKSubstation-AdjacentKSGeary County230 kV300 MW3.5 yrs67.5
Greenfield (MORRIS - JEFFREY)GreenfieldKSMorris County345 kV600 MW3.5 yrs66.1
Greenfield (LANG - MORRIS)GreenfieldKSMorris County345 kV600 MW3.5 yrs65.7
Greenfield (SUMMIT - JEFFREY)GreenfieldKSGeary County345 kV600 MW3.5 yrs65.6
UNKNOWN119572Substation-AdjacentKSGeary County115 kV100 MW3.5 yrs64.7
Greenfield (MORRIS - JEFFREY)GreenfieldKSWabaunsee County345 kV600 MW3.5 yrs64.7
UNKNOWN118082Substation-AdjacentKSGeary County115 kV100 MW3.5 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MORRIS substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.