GARDNER ENERGY CENTER

Substation

Kansas · KANSAS CITY POWER & LIGHT CO

Max voltage
161
kV

GARDNER ENERGY CENTER is an electric transmission substation in Kansas, operated by KANSAS CITY POWER & LIGHT CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorKANSAS CITY POWER & LIGHT CO
StateKansas
Coordinates38.8113, -94.9044

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#31392161 kVKANSAS CITY POWER & LIGHT CO0.0 mi
#55095161 kVKANSAS CITY POWER & LIGHT COIN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GARDNER ENERGY CENTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GARDNER ENERGY CENTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117601Substation-AdjacentKSJohnson County345 kV600 MW3.5 yrs75.9
WEST GARDNERSubstation-AdjacentKSJohnson County345 kV600 MW3.5 yrs73.6
UNKNOWN118616Substation-AdjacentKSJohnson County345 kV600 MW3.5 yrs73.3
STILWELLSubstation-AdjacentKSJohnson County345 kV600 MW3.5 yrs72.6
UNKNOWN118111Substation-AdjacentKSWyandotte County161 kV100 MW3.5 yrs72.0
TAP138812Substation-AdjacentKSJohnson County161 kV100 MW3.5 yrs71.9
UNKNOWN121754Substation-AdjacentMOJackson County161 kV100 MW1.4 yrs71.8
UNKNOWN117612Substation-AdjacentMOClay County161 kV100 MW1.4 yrs71.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GARDNER ENERGY CENTER substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.