PIONEER PRAIRIE PHASE I

Substation

Iowa · MIDAMERICAN ENERGY CO

Max voltage
345
kV

PIONEER PRAIRIE PHASE I is an electric transmission substation in Iowa, operated by MIDAMERICAN ENERGY CO. It is classified as high-voltage (345 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines2

Ownership & operation

OperatorMIDAMERICAN ENERGY CO
StateIowa
Coordinates43.0337, -92.2570

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1047345 kVIN SERVICE2.5 mi
#37238345 kVMIDAMERICAN ENERGY COIN SERVICE72.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PIONEER PRAIRIE PHASE I, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PIONEER PRAIRIE PHASE I substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PIONEER PRAIRIE PHASE ISubstation-AdjacentIAChickasaw County345 kV600 MW1.4 yrs71.8
Greenfield (PIONEER PRAIRIE PHASE I - HAZL)GreenfieldIAFayette County345 kV600 MW1.4 yrs69.8
Greenfield (PIONEER PRAIRIE PHASE I - HAZL)GreenfieldIAChickasaw County345 kV600 MW1.4 yrs69.2
Greenfield (PIONEER PRAIRIE PHASE I - HAZL)GreenfieldIAFayette County345 kV600 MW1.4 yrs68.2
Greenfield (PIONEER PRAIRIE PHASE I - HAZL)GreenfieldIAChickasaw County345 kV600 MW1.4 yrs67.2
Greenfield (PIONEER PRAIRIE PHASE I - HAZL)GreenfieldIAChickasaw County345 kV600 MW1.4 yrs66.9
EC Near Waverly Municipal Electric North PlantGreenfieldIABremer1.4 yrs66.5
Greenfield (PIONEER PRAIRIE PHASE I - HAZL)GreenfieldIAChickasaw County345 kV600 MW1.4 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PIONEER PRAIRIE PHASE I substation, Iowa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.