MARION

Substation

Iowa · MIDAMERICAN ENERGY CO

Max voltage
115
kV

MARION is an electric transmission substation in Iowa, operated by MIDAMERICAN ENERGY CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMIDAMERICAN ENERGY CO
StateIowa
Coordinates42.0015, -91.6011

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2582115 kVMIDAMERICAN ENERGY COIN SERVICE3.2 mi
#17291115 kVMIDAMERICAN ENERGY COIN SERVICE10.3 mi
#31435115 kVMIDAMERICAN ENERGY COIN SERVICE5.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MARION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MARION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TIFFINSubstation-AdjacentIAJohnson County345 kV600 MW1.4 yrs78.6
ARNOLDSubstation-AdjacentIALinn County345 kV600 MW1.4 yrs74.8
UNKNOWN159106Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs74.4
UNKNOWN132168Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs72.8
UNKNOWN132111Substation-AdjacentIALinn County161 kV100 MW1.4 yrs71.6
UNKNOWN137652Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs71.6
RISER137656Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs71.6
UNKNOWN132106Substation-AdjacentIALinn County115 kV100 MW1.4 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.