CRESTON

Substation

Iowa · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
161
kV

CRESTON is an electric transmission substation in Iowa, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
StateIowa
Coordinates41.2036, -94.4757

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#12298161 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE62.4 mi
#12299161 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE11.4 mi
#12301161 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE36.3 mi
#51639161 kVIN SERVICE21.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CRESTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CRESTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROLLING HILLSSubstation-AdjacentIAAdams County345 kV600 MW1.4 yrs72.7
UNKNOWN131419Substation-AdjacentIAMadison County161 kV100 MW1.4 yrs67.9
UNKNOWN137682Substation-AdjacentIAGuthrie County161 kV100 MW1.4 yrs67.0
Greenfield (ROLLING HILLS - MADISON COUNTY)GreenfieldIAUnion County345 kV600 MW1.4 yrs66.3
UNKNOWN131000Substation-AdjacentIACass County161 kV100 MW1.4 yrs66.3
Greenfield (ATCHISON - BOONEVILLE)GreenfieldIAMadison County345 kV600 MW3.5 yrs66.1
UNKNOWN131420Substation-AdjacentIATaylor County161 kV100 MW1.4 yrs66.1
Greenfield (UNKNOWN137755 - GRIMES)GreenfieldIAMadison County345 kV600 MW3.5 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CRESTON substation, Iowa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.