COLBY

Substation

Iowa · ITC

Max voltage
161
kV

COLBY is an electric transmission substation in Iowa, operated by ITC. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines5

Ownership & operation

OperatorITC
Co-ownerMIDAMERICAN ENERGY CO
StateIowa
Coordinates43.1904, -93.2748

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9101161 kVIN SERVICE7.2 mi
#9107161 kVIN SERVICE11.8 mi
#10709161 kVIN SERVICE4.7 mi
#10735161 kVMIDAMERICAN ENERGY COIN SERVICE4.9 mi
#13609161 kVITCIN SERVICE11.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COLBY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COLBY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN138092Substation-AdjacentIAWorth County161 kV100 MW1.4 yrs74.3
UNKNOWN130590Substation-AdjacentIACerro Gordo County161 kV100 MW1.4 yrs74.3
UNKNOWN133291Substation-AdjacentMNFreeborn County161 kV100 MW1.4 yrs74.1
UNKNOWN173443Substation-AdjacentIACerro Gordo County161 kV100 MW1.4 yrs73.6
UNKNOWN130513Substation-AdjacentIACerro Gordo County161 kV100 MW1.4 yrs73.5
UNKNOWN133291Substation-AdjacentIAWorth County161 kV100 MW1.4 yrs72.7
TAP173444Substation-AdjacentIACerro Gordo County161 kV100 MW1.4 yrs72.0
UNKNOWN129404Substation-AdjacentIAWorth County161 kV100 MW1.4 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for COLBY substation, Iowa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.