TAP154085

Substation

Indiana · DUKE ENERGY INDIANA, LLC

Max voltage
138
kV

TAP154085 is an electric transmission substation in Indiana, operated by DUKE ENERGY INDIANA, LLC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY INDIANA, LLC
StateIndiana
Coordinates40.3541, -86.8302

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9843138 kVDUKE ENERGY INDIANA, LLCIN SERVICE3.7 mi
#28053138 kVDUKE ENERGY INDIANA, LLCIN SERVICE0.6 mi
#30353138 kVDUKE ENERGY INDIANA, LLCIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154085, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154085 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEQUINESubstation-AdjacentINTippecanoe County345 kV600 MW3.0 yrs73.3
LAFAYETTE 230Substation-AdjacentINTippecanoe County230 kV300 MW3.0 yrs73.1
UNKNOWN123283Substation-AdjacentINWhite County345 kV600 MW3.0 yrs71.9
MEADOW LAKE WIND FARM II LLCSubstation-AdjacentINWhite County345 kV600 MW3.0 yrs71.8
NUCORSubstation-AdjacentINMontgomery County345 kV600 MW3.0 yrs71.3
UNKNOWN123368Substation-AdjacentINTippecanoe County345 kV600 MW3.0 yrs71.1
MEADOW LAKESubstation-AdjacentINWhite County345 kV600 MW3.0 yrs70.8
UNKNOWN123974Substation-AdjacentINBenton County345 kV600 MW4.6 yrs70.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154085 substation, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.