TAP139001

Substation

Indiana · DUKE ENERGY INDIANA INC

Max voltage
138
kV

TAP139001 is an electric transmission substation in Indiana, operated by DUKE ENERGY INDIANA INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY INDIANA INC
StateIndiana
Coordinates38.2857, -85.8148

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4594138 kVDUKE ENERGY INDIANA INCIN SERVICE0.1 mi
#16073138 kVDUKE ENERGY INDIANA INCIN SERVICE2.5 mi
#41221138 kVDUKE ENERGY INDIANA INCIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139001, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139001 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CANE RUNSubstation-AdjacentINFloyd County345 kV600 MW3.0 yrs74.0
CANE RUN SWITCHINGSubstation-AdjacentKYJefferson County345 kV600 MW3.0 yrs73.3
TAP139013Substation-AdjacentINHarrison County345 kV600 MW3.0 yrs72.9
MIDDLETOWN 345 KVSubstation-AdjacentKYJefferson County345 kV600 MW3.0 yrs72.8
MILL CREEK STATIONSubstation-AdjacentKYJefferson County345 kV600 MW3.0 yrs72.3
NORTHSIDESubstation-AdjacentINClark County345 kV600 MW3.0 yrs71.9
HARDINSubstation-AdjacentINFloyd County345 kV600 MW3.0 yrs71.8
SPEEDSubstation-AdjacentINClark County345 kV600 MW3.0 yrs71.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139001 substation, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.