RABER

Substation

Indiana · INDIANA MICHIGAN POWER CO

Max voltage
138
kV

RABER is an electric transmission substation in Indiana, operated by INDIANA MICHIGAN POWER CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorINDIANA MICHIGAN POWER CO
StateIndiana
Coordinates41.2725, -85.6494

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8136138 kVIN SERVICE32.1 mi
#45769138 kVINDIANA MICHIGAN POWER COIN SERVICE2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RABER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RABER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SORENSONSubstation-AdjacentINHuntington County765 kV1,000 MW3.0 yrs74.2
HIPLESubstation-AdjacentINElkhart County345 kV600 MW2.2 yrs74.1
COLLINGWOODSubstation-AdjacentINNoble County345 kV600 MW3.0 yrs71.6
MERIDIANSubstation-AdjacentINKosciusko County345 kV600 MW3.0 yrs71.0
LEESBURGSubstation-AdjacentINKosciusko County345 kV600 MW3.0 yrs70.6
UNKNOWN122936Substation-AdjacentINElkhart County138 kV100 MW3.0 yrs68.7
Greenfield (UNKNOWN122939 - HIPLE)GreenfieldINElkhart County345 kV600 MW2.2 yrs68.5
E. WHITLEYSubstation-AdjacentINWhitley County345 kV600 MW3.0 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RABER substation, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.