NEW HARDINSBURG

Substation

Indiana

Max voltage
161
kV

NEW HARDINSBURG is an electric transmission substation in Indiana. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

StateIndiana
Coordinates37.6998, -86.5328

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2756161 kVIN SERVICE2.0 mi
#10026161 kVIN SERVICE38.7 mi
#25073161 kVIN SERVICE17.2 mi
#8281138 kVIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEW HARDINSBURG, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEW HARDINSBURG substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DAVIESS COUNTYSubstation-AdjacentKYHancock County345 kV600 MW3.0 yrs71.6
UNKNOWN124236Substation-AdjacentKYHancock County345 kV600 MW3.0 yrs70.2
Greenfield (JEFFERSON - ROCKPORT STATION)GreenfieldINSpencer County765 kV1,000 MW4.6 yrs68.2
Kenneth C ColemanBrownfieldKYHancock County602 MW3.6 yrs66.5
HARDINSubstation-AdjacentKYGrayson County345 kV600 MW3.6 yrs66.1
KENTUCKY MILLSSubstation-AdjacentKYHancock County161 kV100 MW3.0 yrs65.6
UNKNOWN155591Substation-AdjacentKYGrayson County138 kV100 MW3.6 yrs65.6
UNKNOWN130540Substation-AdjacentKYHancock County161 kV100 MW3.0 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.