VICTOR
SubstationIdaho · BONNEVILLE POWER ADMINISTRATION
VICTOR is an electric transmission substation in Idaho, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #68310 | 115 kV | BONNEVILLE POWER ADMINISTRATION | — | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of VICTOR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP206874 | Substation-Adjacent | ID | Teton County | 138 kV | 100 MW | 2.0 yrs | 63.9 |
| TAP204988 | Substation-Adjacent | ID | Teton County | 138 kV | 100 MW | 2.0 yrs | 63.6 |
| TAP204983 | Substation-Adjacent | ID | Fremont County | 115 kV | 100 MW | 2.0 yrs | 63.4 |
| SWAN VALLEY | Substation-Adjacent | ID | Bonneville County | 161 kV | 100 MW | 2.0 yrs | 63.3 |
| FELT | Substation-Adjacent | ID | Teton County | 138 kV | 100 MW | 2.0 yrs | 62.1 |
| TARGHEE TAP | Substation-Adjacent | ID | Teton County | 115 kV | 100 MW | 2.0 yrs | 61.6 |
| TETON | Substation-Adjacent | ID | Teton County | 115 kV | 100 MW | 1.7 yrs | 59.5 |
| CRYSTAL SPRINGS | Substation-Adjacent | ID | Teton County | 115 kV | 100 MW | 1.7 yrs | 59.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for VICTOR substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.