TAP207693

Substation

Idaho · LOST RIVER ELECTRIC COOP INC

Max voltage
115
kV

TAP207693 is an electric transmission substation in Idaho, operated by LOST RIVER ELECTRIC COOP INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorLOST RIVER ELECTRIC COOP INC
StateIdaho
Coordinates43.9192, -113.6068

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75528115 kVLOST RIVER ELECTRIC COOP INC0.1 mi
#75529115 kVLOST RIVER ELECTRIC COOP INC0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207693, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207693 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN205298Substation-AdjacentIDButte County230 kV300 MW2.0 yrs65.0
LOST RIVERSubstation-AdjacentIDButte County230 kV300 MW2.0 yrs63.3
Greenfield (LOST RIVER - SPAR CANYON)GreenfieldIDCuster County230 kV300 MW2.0 yrs58.0
Greenfield (LOST RIVER - SPAR CANYON)GreenfieldIDCuster County230 kV300 MW2.0 yrs57.9
Greenfield (TAP207694 - TAP207695)GreenfieldIDCuster County115 kV100 MW1.1 yrs57.9
Greenfield (TAP207694 - TAP207695)GreenfieldIDCuster County115 kV100 MW1.1 yrs57.5
Greenfield (LOST RIVER - SPAR CANYON)GreenfieldIDButte County230 kV300 MW2.0 yrs57.2
Greenfield (LOST RIVER - SPAR CANYON)GreenfieldIDCuster County230 kV300 MW2.0 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207693 substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.