TAP207331

Substation

Idaho · IDAHO POWER CO

Max voltage
138
kV

TAP207331 is an electric transmission substation in Idaho, operated by IDAHO POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorIDAHO POWER CO
StateIdaho
Coordinates42.9242, -114.6289

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75041138 kVIDAHO POWER CO1.6 mi
#75042138 kVIDAHO POWER CO8.2 mi
#75043138 kVIDAHO POWER COINACTIVE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207331, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207331 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUNTSubstation-AdjacentIDJerome County230 kV300 MW2.0 yrs70.3
MIDPOINT (500KV)Substation-AdjacentIDJerome County500 kV1,000 MW1.7 yrs69.0
TAP204826Substation-AdjacentIDJerome County138 kV100 MW2.0 yrs65.8
KIMBERLYSubstation-AdjacentIDJerome County138 kV100 MW2.0 yrs65.6
TAP204823Substation-AdjacentIDJerome County138 kV100 MW2.0 yrs65.5
TWIN FALLSSubstation-AdjacentIDJerome County138 kV100 MW2.0 yrs65.3
UNKNOWN205046Substation-AdjacentIDGooding County138 kV100 MW2.0 yrs65.3
SOUTH PARKSubstation-AdjacentIDJerome County115 kV100 MW2.0 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207331 substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.