TAP207263

Substation

Idaho · IDAHO POWER CO

Max voltage
115
kV

TAP207263 is an electric transmission substation in Idaho, operated by IDAHO POWER CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorIDAHO POWER CO
StateIdaho
Coordinates44.2992, -116.0782

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74941115 kVIDAHO POWER CO8.3 mi
#74942115 kVIDAHO POWER CO0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207263, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207263 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP206521Substation-AdjacentIDGem County115 kV100 MW2.0 yrs65.8
TAP207418Substation-AdjacentIDValley County115 kV100 MW1.1 yrs65.4
UNKNOWN206522Substation-AdjacentIDGem County115 kV100 MW2.0 yrs63.7
Greenfield (BOISE BENCH - BROWNLEE)GreenfieldIDGem County230 kV300 MW1.7 yrs61.8
OLASubstation-AdjacentIDGem County115 kV100 MW2.0 yrs61.5
Greenfield (BOISE BENCH - BROWNLEE)GreenfieldIDGem County230 kV300 MW1.7 yrs61.0
Greenfield (TAP207263 - TAP207418)GreenfieldIDGem County115 kV100 MW1.1 yrs60.5
Greenfield (BOISE BENCH - BROWNLEE)GreenfieldIDGem County230 kV300 MW1.7 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207263 substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.