TAP207241

Substation

Idaho · PACIFICORP

Max voltage
115
kV

TAP207241 is an electric transmission substation in Idaho, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPACIFICORP
StateIdaho
Coordinates42.1081, -111.2638

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75235115 kVPACIFICORP0.1 mi
#75236115 kVPACIFICORP0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207241, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207241 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202637Substation-AdjacentIDBear Lake County138 kV100 MW2.0 yrs68.1
Greenfield (3 MILE KNOLL - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs67.8
TAP207239Substation-AdjacentIDBear Lake County115 kV100 MW2.0 yrs66.7
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs66.5
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs66.1
Greenfield (3 MILE KNOLL - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs65.7
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs65.7
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207241 substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.