TAP207240

Substation

Idaho · PACIFICORP

Max voltage
115
kV

TAP207240 is an electric transmission substation in Idaho, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateIdaho
Coordinates42.1092, -111.2641

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75233115 kVPACIFICORP6.1 mi
#75234115 kVPACIFICORP0.1 mi
#75235115 kVPACIFICORP0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207240, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207240 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202637Substation-AdjacentIDBear Lake County138 kV100 MW2.0 yrs68.1
Greenfield (3 MILE KNOLL - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs67.8
TAP207239Substation-AdjacentIDBear Lake County115 kV100 MW2.0 yrs66.7
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs66.5
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs66.1
Greenfield (3 MILE KNOLL - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs65.7
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs65.7
Greenfield (POPULUS - JIM BRIDGER)GreenfieldIDBear Lake County345 kV600 MW1.7 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen