TAP204857

Substation

Idaho · IDAHO POWER CO

Max voltage
138
kV

TAP204857 is an electric transmission substation in Idaho, operated by IDAHO POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorIDAHO POWER CO
StateIdaho
Coordinates43.0610, -115.4710

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70359138 kVIDAHO POWER CO0.0 mi
#70360138 kVIDAHO POWER CO13.4 mi
#70383138 kVIDAHO POWER CO5.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204857, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204857 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BENNETT MOUNTAINSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs71.9
EVANDER ANDREWS POWER COMPLEXSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs70.9
RYEGRASS WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs69.8
UNKNOWN205044Substation-AdjacentIDElmore County230 kV300 MW2.0 yrs69.5
COLD SPRINGS WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs68.5
HAMMETT HILL WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs68.3
UNKNOWN205041Substation-AdjacentIDGooding County230 kV300 MW2.0 yrs68.0
MAINLINE WINDFARMSubstation-AdjacentIDElmore County230 kV300 MW2.0 yrs68.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP204857 substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.