TAP204718

Substation

Idaho · PACIFICORP

Max voltage
230
kV

TAP204718 is an electric transmission substation in Idaho, operated by PACIFICORP. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorPACIFICORP
StateIdaho
Coordinates43.8546, -111.6980

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70102230 kVPACIFICORP20.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204718, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204718 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RIGBYSubstation-AdjacentIDMadison County230 kV300 MW2.0 yrs71.8
TAP204718Substation-AdjacentIDMadison County230 kV300 MW2.0 yrs69.9
TAP204670Substation-AdjacentIDBonneville County161 kV100 MW2.0 yrs68.6
WASHINGTONSubstation-AdjacentIDBonneville County161 kV100 MW2.0 yrs68.3
JOLLY HILLSubstation-AdjacentIDBonneville County161 kV100 MW2.0 yrs67.5
TAP204706Substation-AdjacentIDMadison County161 kV100 MW2.0 yrs66.8
MEADOW CREEK PROJECT COMPANYSubstation-AdjacentIDBonneville County161 kV100 MW2.0 yrs66.5
UNKNOWN204720Substation-AdjacentIDFremont County115 kV100 MW2.0 yrs64.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen