TAP203129

Substation

Idaho · IDAHO POWER CO

Max voltage
345
kV

TAP203129 is an electric transmission substation in Idaho, operated by IDAHO POWER CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorIDAHO POWER CO
StateIdaho
Coordinates42.7447, -113.6872

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67255345 kVIDAHO POWER CO41.3 mi
#67256345 kVIDAHO POWER CO3.6 mi
#79130345 kVIDAHO POWER CO37.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203129, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203129 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP203129Substation-AdjacentIDMinidoka County345 kV600 MW2.0 yrs70.7
ADELAIDESubstation-AdjacentIDMinidoka County345 kV600 MW2.0 yrs70.4
WEST BURLEYSubstation-AdjacentIDCassia County138 kV100 MW2.0 yrs67.4
RIVERTONSubstation-AdjacentIDCassia County138 kV100 MW2.0 yrs67.0
PACIFICSubstation-AdjacentIDCassia County138 kV100 MW2.0 yrs66.9
TAP206887Substation-AdjacentIDCassia County115 kV100 MW2.0 yrs66.7
TAP206873Substation-AdjacentIDCassia County115 kV100 MW2.0 yrs66.3
Greenfield (MIDPOINT - ADELAIDE)GreenfieldIDMinidoka County345 kV600 MW2.0 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203129 substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.