TABER

Substation

Idaho · IDAHO POWER CO

Max voltage
138
kV

TABER is an electric transmission substation in Idaho, operated by IDAHO POWER CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage115 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorIDAHO POWER CO
StateIdaho
Coordinates43.3113, -112.6739

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70207138 kVIDAHO POWER CO5.1 mi
#74897115 kVIDAHO POWER CO5.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TABER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TABER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP204736Substation-AdjacentIDBannock County138 kV100 MW2.0 yrs66.9
PINGREESubstation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.8
TAP204775Substation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.6
TAP204764Substation-AdjacentIDPower County138 kV100 MW2.0 yrs66.6
TAP204750Substation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.6
TAP204759Substation-AdjacentIDPower County161 kV100 MW2.0 yrs66.5
TYHEESubstation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.5
TAP204751Substation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TABER substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.