HUNT is an electric transmission substation in Idaho, operated by IDAHO POWER CO. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorIDAHO POWER CO
StateIdaho
Coordinates42.6327, -114.2325

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70287230 kVIDAHO POWER CO30.0 mi
#70295138 kVIDAHO POWER CO3.1 mi
#70324138 kVIDAHO POWER CO5.1 mi
#79150138 kVIDAHO POWER CO12.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HUNT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HUNT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUNTSubstation-AdjacentIDJerome County230 kV300 MW2.0 yrs70.3
MIDPOINT (500KV)Substation-AdjacentIDJerome County500 kV1,000 MW1.7 yrs69.0
TAP206887Substation-AdjacentIDCassia County115 kV100 MW2.0 yrs66.7
TAP206873Substation-AdjacentIDCassia County115 kV100 MW2.0 yrs66.3
Greenfield (MIDPOINT - ADELAIDE)GreenfieldIDMinidoka County345 kV600 MW2.0 yrs66.2
TAP206871Substation-AdjacentIDCassia County115 kV100 MW2.0 yrs65.8
TAP204826Substation-AdjacentIDJerome County138 kV100 MW2.0 yrs65.8
KIMBERLYSubstation-AdjacentIDJerome County138 kV100 MW2.0 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HUNT substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.