ANTELOPE

Substation

Idaho · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

ANTELOPE is an electric transmission substation in Idaho, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerIDAHO POWER CO
Co-ownerPACIFICORP
StateIdaho
Coordinates43.5338, -112.9265

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70121230 kVPACIFICORP43.4 mi
#70178230 kVIDAHO POWER CO56.5 mi
#70245230 kVPACIFICORP0.2 mi
#70247230 kVBONNEVILLE POWER ADMINISTRATION31.3 mi
#70248161 kVPACIFICORP0.2 mi
#70244115 kVPACIFICORP0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ANTELOPE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ANTELOPE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN205285Substation-AdjacentIDJefferson County230 kV300 MW2.0 yrs67.9
TAP204775Substation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.6
TAP204751Substation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.5
TAP204776Substation-AdjacentIDBingham County138 kV100 MW2.0 yrs66.5
TAP204801Substation-AdjacentIDButte County230 kV300 MW2.0 yrs66.3
TABERSubstation-AdjacentIDBingham County138 kV100 MW2.0 yrs65.9
UNKNOWN205298Substation-AdjacentIDButte County230 kV300 MW2.0 yrs65.0
UNKNOWN205294Substation-AdjacentIDJefferson County230 kV300 MW2.0 yrs63.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ANTELOPE substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.