WOODWARD SUBSTATION

Substation

Arkansas · ENTERGY ARKANSAS INC

Max voltage
230
kV

WOODWARD SUBSTATION is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as high-voltage (230 kv) and connects 14 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines14

Ownership & operation

OperatorENTERGY ARKANSAS INC
Coordinates34.2180, -92.0803

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#48705230 kVENTERGY ARKANSAS INCIN SERVICE75.7 mi
#26620230 kVENTERGY ARKANSAS INCIN SERVICE42.9 mi
#54161230 kVENTERGY ARKANSAS INCIN SERVICE0.2 mi
#20744115 kVENTERGY ARKANSAS INCIN SERVICE8.4 mi
#28366115 kVENTERGY ARKANSAS INCIN SERVICE5.2 mi
#28383115 kVENTERGY ARKANSAS INCIN SERVICE1.7 mi
#827115 kVENTERGY ARKANSAS INCIN SERVICE14.6 mi
#40044115 kVENTERGY ARKANSAS INCIN SERVICE10.3 mi
#41585115 kVENTERGY ARKANSAS INCIN SERVICE20.6 mi
#41710115 kVENTERGY ARKANSAS INCIN SERVICE2.7 mi
#48928115 kVENTERGY ARKANSAS INCIN SERVICE3.5 mi
#37655115 kVENTERGY ARKANSAS INCIN SERVICE21.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WOODWARD SUBSTATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WOODWARD SUBSTATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WHITE BLUFFSubstation-AdjacentARGrant County500 kV1,000 MW1.4 yrs72.9
Greenfield (MABELVALE SUBSTATION - WRIGHTS)GreenfieldARPulaski County500 kV1,000 MW1.4 yrs68.9
WRIGHTSVILLESubstation-AdjacentARPulaski County500 kV1,000 MW1.4 yrs68.5
Greenfield (WHITE BLUFF - KEO SUBSTATION)GreenfieldARLonoke County500 kV1,000 MW1.4 yrs66.9
Greenfield (EL DORADO SUBSTATION - SHERIDA)GreenfieldARDallas County500 kV1,000 MW1.4 yrs66.4
UNKNOWN156961Substation-AdjacentARJefferson County230 kV300 MW1.4 yrs65.9
Greenfield (MABELVALE SUBSTATION - SHERIDA)GreenfieldARGrant County500 kV1,000 MW1.4 yrs65.5
UNKNOWN108117Substation-AdjacentARLonoke County115 kV100 MW1.4 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WOODWARD SUBSTATION substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.