TYLER

Substation

Arkansas · ENTERGY ARKANSAS INC

Max voltage
161
kV

TYLER is an electric transmission substation in Arkansas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorENTERGY ARKANSAS INC
Coordinates35.0929, -92.4993

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5494161 kVENTERGY ARKANSAS INCIN SERVICE0.9 mi
#18274161 kVENTERGY ARKANSAS INCIN SERVICE1.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TYLER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TYLER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MAYFLOWERSubstation-AdjacentARPulaski County500 kV1,000 MW1.4 yrs73.3
PLEASANT HILLSubstation-AdjacentARConway County500 kV1,000 MW1.4 yrs70.2
UNKNOWN107775Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.9
UNKNOWN154333Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.8
UNKNOWN117265Substation-AdjacentARPulaski County115 kV100 MW1.4 yrs68.5
Greenfield (MABELVALE SUBSTATION - MAYFLOW)GreenfieldARSaline County500 kV1,000 MW1.4 yrs68.5
LITTLE ROCK PINNACLESubstation-AdjacentARPulaski County161 kV100 MW1.4 yrs68.4
MABELVALE SUBSTATIONSubstation-AdjacentARSaline County500 kV1,000 MW1.4 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TYLER substation, Arkansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.